THERMOSELECT
Vivera
© Copyright 2024 THERMOSELECT
Installation de Mutsu / Japon
Since April 1st, 2003, a Thermoselect plant is in commercial operation in Mutsu in the
north of Japan. The plant is equipped with two thermal treatment lines and has a
capacity of 140 tons per day.
The plant operates on municipal solid waste (MSW) and has been built by a
Thermoselect sub-licensee in Japan, Mitsubishi Materials Co.
A gas engine power production facility is integrated into plant, transforming the
syngas efficiently into electrical power with two 1.2 MW engines.
Gas engine-module 2x1.2
MW el
Building
External View
Charactéristiques du procédé
Description du procédé
Schéma
Produits
Utilisation du gaz de synthèse
Hidrogène
Enviroment
Comparatif
Rentabilité
Fondotoce
Karlsruhe
Installations Thermoselect au Japon
Chiba
Mutsu